On December 21, 2018 an analysis was completed examining the moisture and humidity issues in three Cambridge Public Schools' buildings. This analysis was conducted in response to complaints of excessive condensation during the summer of 2018. Condensation damaged many finishes which resulted in various levels of mildew and mold in several rooms. Removal and replacement of the damaged finishes were required. The condensation occurred on multiple surfaces including on insulated pipes.
View the full report >>